BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Fish Factory & Hold

Assembly

The processing line and refrigerated hold that turn the catch into a stable product: gutting and heading machines, a plate or blast freezer, and an insulated freezer hold for storage on long trips. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Fish Factory & Hold parts and their functions

7 top-level parts · 340 parts in total · full bill of materials below
Fish Factory & Hold parts diagram: 1 receiving pound, 2 heading machine, 3 filleting machine, 4 plate freezer, 5 refrigeration plant, 6 freezer hold, 7 fishmeal plant. 340 parts in 7 top-level items.
Fish Factory & Hold parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Receiving Pound 2× Deck receiving pounds and conveyors
2 Heading Machine 4 parts 2× Heading and gutting machines
3 Filleting Machine 4 parts 2× Filleting machines
4 Plate Freezer 4× Horizontal plate freezers
5 Refrigeration Plant 5 parts 1× Refrigeration plant
6 Freezer Hold 1× Insulated freezer hold
7 Fishmeal Plant 4 parts 1× Fishmeal plant for offal

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Fish Factory & Hold

7 top-level lines · 36 rows shown · 340 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Receiving Pound stern-trawler-receiving-pound 2× 2 · part
2 Heading Machine 4 parts stern-trawler-heading-machine 2× 2 57 assembly
2.1 Servo Motor 4 parts servo-motor 2× 4 24 assembly
2.1.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 4 3 assembly
2.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 4 19 assembly
2.1.3 Encoder encoder 1× 4 · part
2.1.4 Motor Housing motor-housing 1× 4 · part
2.2 Cutter Set stern-trawler-cutter-set 1× 2 · part
2.3 Ball Bearing ball-bearing 4× 8 · part
2.4 Sheet Metal Panel sheet-panel 4× 8 · part
3 Filleting Machine 4 parts stern-trawler-filleting-machine 2× 2 57 assembly
3.1 Servo Motor 4 parts servo-motor 2× 4 24 assembly
3.1.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 4 3 assembly
3.1.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 4 19 assembly
3.1.3 Encoder encoder 1× 4 · part
3.1.4 Motor Housing motor-housing 1× 4 · part
3.2 Cutter Set stern-trawler-cutter-set 1× 2 · part
3.3 Ball Bearing ball-bearing 4× 8 · part
3.4 Sheet Metal Panel sheet-panel 4× 8 · part
4 Plate Freezer stern-trawler-plate-freezer 4× 4 · part
5 Refrigeration Plant 5 parts stern-trawler-refrig-plant 1× 1 27 assembly
5.1 Refrigeration Compressor stern-trawler-refrig-compressor 3× 3 · part
5.2 Condenser stern-trawler-condenser 2× 2 · part
5.3 Coolant Pump coolant-pump 2× 2 · part
5.4 Pressure Sensor pressure-sensor 8× 8 · part
5.5 O-Ring Set oring-set 12× 12 · part
6 Freezer Hold stern-trawler-freezer-hold 1× 1 · part
7 Fishmeal Plant 4 parts stern-trawler-fishmeal-plant 1× 1 78 assembly
7.1 Meal Cooker stern-trawler-meal-cooker 1× 1 · part
7.2 Meal Press stern-trawler-meal-press 1× 1 · part
7.3 Servo Motor 4 parts servo-motor 3× 3 24 assembly
7.3.1 Stator Assembly 3 parts + deeper › stator-assembly 1× 3 3 assembly
7.3.2 Rotor Assembly 4 parts + deeper › rotor-assembly 1× 3 19 assembly
7.3.3 Encoder encoder 1× 3 · part
7.3.4 Motor Housing motor-housing 1× 3 · part
7.4 Heating Element heating-element 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the fish factory & hold is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks