BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Terry Pile Motion

Assembly

The mechanism that beats up in groups and shifts the cloth fell so the ground binds loops of pile. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Terry Pile Motion parts and their functions

6 top-level parts · 9 parts in total · full bill of materials below
Terry Pile Motion parts diagram: 1 sley, 2 weaving reed, 3 cloth-fell shifter, 4 terry cam, 5 loose-pick servo, 6 ball bearing. 9 parts in 6 top-level items.
Terry Pile Motion parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Sley 1× Sley
2 Weaving Reed 1× Weaving reed
3 Cloth-Fell Shifter 1× Cloth-fell shifter
4 Terry Cam 1× Terry cam
5 Loose-Pick Servo 1× Loose-pick servo
6 Ball Bearing 4× Sley bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Terry Pile Motion

6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Sley terry-towel-loom-sley 1× 1 · part
2 Weaving Reed terry-towel-loom-reed 1× 1 · part
3 Cloth-Fell Shifter terry-towel-loom-cloth-fell-shifter 1× 1 · part
4 Terry Cam terry-towel-loom-terry-cam 1× 1 · part
5 Loose-Pick Servo terry-towel-loom-loose-pick-servo 1× 1 · part
6 Ball Bearing ball-bearing 4× 4 · part

Something wrong in this list? Report a problem with this BOM.

Where the terry pile motion is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks