Looper / Hook Bar Assembly
AssemblyBelow the bed, the looper bar swings hooks up to catch each needle loop; for cut pile the hooks pair with reciprocating knives to slice the loops open, all driven from a synchronized looper drive shaft. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Looper / Hook Bar Assembly parts and their functions
6 top-level parts · 972 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Looper / Hook Bar | 1× | Full-width looper/hook bar |
| 2 | Looper / Hook | 480× | Loop-pile loopers / cut-pile hooks |
| 3 | Cut-Pile Knife | 480× | Cut-pile knives |
| 4 | Looper Rocker Shaft | 1× | Looper rocker drive shaft |
| 5 | Drive Eccentric | 4× | Looper drive eccentrics |
| 6 | Ball Bearing | 6× | Looper shaft bearings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Looper / Hook Bar Assembly
6 top-level lines · 6 rows shown · 972 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Looper / Hook Bar | tufting-machine-looper-bar | 1× | 1 | · | part |
| 2 | Looper / Hook | tufting-machine-looper | 480× | 480 | · | part |
| 3 | Cut-Pile Knife | tufting-machine-knife | 480× | 480 | · | part |
| 4 | Looper Rocker Shaft | tufting-machine-looper-drive-shaft | 1× | 1 | · | part |
| 5 | Drive Eccentric | tufting-machine-eccentric | 4× | 4 | · | part |
| 6 | Ball Bearing | ball-bearing | 6× | 6 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the looper / hook bar assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |