Take-Up Winding Head
AssemblyThe winder above each spindle that takes the twisted yarn and lays it onto a cross-wound package. A grooved drum drives the package by friction and the traverse spreads the yarn across the package width so it builds without ridges and unwinds cleanly later. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Take-Up Winding Head parts and their functions
5 top-level parts · 8 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Grooved Take-Up Drum | 1× | Grooved take-up drum |
| 2 | Package Cradle | 1× | Package cradle |
| 3 | Traverse Mechanism 3 parts | 1× | Traverse mechanism |
| 4 | Drum Shaft | 1× | Drum shaft |
| 5 | Ball Bearing | 2× | Drum bearings |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Take-Up Winding Head
5 top-level lines · 8 rows shown · 8 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Grooved Take-Up Drum | two-for-one-twister-take-up-drum | 1× | 1 | · | part |
| 2 | Package Cradle | two-for-one-twister-package-cradle | 1× | 1 | · | part |
| 3 | Traverse Mechanism 3 parts | two-for-one-twister-traverse | 1× | 1 | 3 | assembly |
| 3.1 | Traverse Yarn Guide | two-for-one-twister-traverse-guide | 1× | 1 | · | part |
| 3.2 | Traverse Cam | two-for-one-twister-cam | 1× | 1 | · | part |
| 3.3 | Coil Spring | coil-spring | 1× | 1 | · | part |
| 4 | Drum Shaft | two-for-one-twister-drum-shaft | 1× | 1 | · | part |
| 5 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
Where the take-up winding head is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $2–$500. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Inovance
inovance.com ↗
|
Shenzhen, CN | Drives & motion control | 500 units | 10–14 wks |
| sonacomstar.com ↗ | Gurugram, IN | EV driveline & motors | 500 units | 10–14 wks |
| broad-ocean.com ↗ | Zhongshan, CN | Electric motors | 500 units | 10–14 wks |
| nidec.com ↗ | Singapore | Motors, regional ops | 500 units | 10–14 wks |
| bosch.in ↗ | Bengaluru, IN | Automotive components | 500 units | 10–14 wks |