Length Metering Counter
AssemblyThe length counter at each position that measures the metres of assembled yarn wound and stops the head at the preset package length so every package holds the same amount. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Length Metering Counter parts and their functions
3 top-level parts · 3 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Measuring Roller | 1× | Measuring roller |
| 2 | Length Encoder | 1× | Length encoder |
| 3 | Ball Bearing | 1× | Measuring roller bearing |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Length Metering Counter
3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Measuring Roller | yarn-doubling-machine-measuring-roller | 1× | 1 | · | part |
| 2 | Length Encoder | yarn-doubling-machine-length-encoder | 1× | 1 | · | part |
| 3 | Ball Bearing | ball-bearing | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the length metering counter is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |