BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Vault Door

Assembly

An armored door with time-delay electronic lock, openable only when the vehicle is immobilized. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Vault Door parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Vault Door parts diagram: 1 vault door leaf, 2 time-delay lock, 3 deadbolt set, 4 door position sensor. 4 parts in 4 top-level items.
Vault Door parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Vault Door Leaf 1× Ballistic steel leaf with stepped edges mating into the frame rebate.
2 Time-Delay Lock 1× Electronic lock enforcing a 5 to 15 minute delay so coerced staff cannot open the vault immediately.
3 Deadbolt Set 1× Multi-point bolts engaging top, bottom, and side of the door frame.
4 Door Position Sensor 1× Switch reporting vault door state to the security controller and depot.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Vault Door

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Vault Door Leaf armored-cash-truck-vault-door-leaf 1× 1 · part
2 Time-Delay Lock armored-cash-truck-time-delay-lock 1× 1 · part
3 Deadbolt Set armored-cash-truck-deadbolt-set 1× 1 · part
4 Door Position Sensor armored-cash-truck-door-sensor 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the vault door is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks