BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Lower Deck

Assembly

Ground-level deck with a folding head ramp for loading. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Lower Deck parts and their functions

5 top-level parts · 12 parts in total · full bill of materials below
Lower Deck parts diagram: 1 lower deck frame, 2 head ramp, 3 lower runway, 4 approach ramp, 5 ramp pivot bracket. 12 parts in 5 top-level items.
Lower Deck parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Lower Deck Frame 1× Lower deck steel frame
2 Head Ramp 1× Folding head ramp over the gooseneck
3 Lower Runway 4× Lower vehicle runways
4 Approach Ramp 2× Rear approach ramps
5 Ramp Pivot Bracket 4× Pivot brackets for folding ramps

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Lower Deck

5 top-level lines · 5 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Lower Deck Frame car-hauler-trailer-lower-frame 1× 1 · part
2 Head Ramp car-hauler-trailer-head-ramp 1× 1 · part
3 Lower Runway car-hauler-trailer-lower-runway 4× 4 · part
4 Approach Ramp car-hauler-trailer-approach-ramp 2× 2 · part
5 Ramp Pivot Bracket car-hauler-trailer-ramp-pivot 4× 4 · part

Where the lower deck is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks