Cargo Securement
AssemblyWinch track, stake pockets, and rub rails for chains and straps. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cargo Securement parts and their functions
6 top-level parts · 60 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Strap Winch | 12× | Sliding strap winches on side track |
| 2 | Winch Track | 2× | Side-mounted winch tracks full length |
| 3 | Stake Pocket | 24× | Formed stake pockets for stakes and chains |
| 4 | Rub Rail | 2× | Outer rub rails protecting deck edge |
| 5 | D-Ring Tie-Down | 8× | Recessed weld-on D-ring tie-downs |
| 6 | Cargo Strap | 12× | Polyester cargo straps, 4 in width |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cargo Securement
6 top-level lines · 6 rows shown · 60 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Strap Winch | flatbed-trailer-semi-winch | 12× | 12 | · | part |
| 2 | Winch Track | flatbed-trailer-semi-winch-track | 2× | 2 | · | part |
| 3 | Stake Pocket | flatbed-trailer-semi-stake-pocket | 24× | 24 | · | part |
| 4 | Rub Rail | flatbed-trailer-semi-rub-rail | 2× | 2 | · | part |
| 5 | D-Ring Tie-Down | flatbed-trailer-semi-d-ring | 8× | 8 | · | part |
| 6 | Cargo Strap | flatbed-trailer-semi-strap | 12× | 12 | · | part |
Where the cargo securement is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $300–$90k. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳BYD
byd.com ↗
|
Shenzhen, CN | EV & battery manufacturer | made to order | · |
| tatamotors.com ↗ | Mumbai, IN | Automaker | made to order | · |
| saicmotor.com ↗ | Shanghai, CN | Automaker | made to order | · |
|
🇮🇳Mahindra
mahindra.com ↗
|
Mumbai, IN | Automaker | made to order | · |
|
🇨🇳Geely
global.geely.com ↗
|
Hangzhou, CN | Automaker | made to order | · |