BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cargo Securement

Assembly

Winch track, stake pockets, and rub rails for chains and straps. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cargo Securement parts and their functions

6 top-level parts · 60 parts in total · full bill of materials below
Cargo Securement parts diagram: 1 strap winch, 2 winch track, 3 stake pocket, 4 rub rail, 5 d-ring tie-down, 6 cargo strap. 60 parts in 6 top-level items.
Cargo Securement parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Strap Winch 12× Sliding strap winches on side track
2 Winch Track 2× Side-mounted winch tracks full length
3 Stake Pocket 24× Formed stake pockets for stakes and chains
4 Rub Rail 2× Outer rub rails protecting deck edge
5 D-Ring Tie-Down 8× Recessed weld-on D-ring tie-downs
6 Cargo Strap 12× Polyester cargo straps, 4 in width

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cargo Securement

6 top-level lines · 6 rows shown · 60 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Strap Winch flatbed-trailer-semi-winch 12× 12 · part
2 Winch Track flatbed-trailer-semi-winch-track 2× 2 · part
3 Stake Pocket flatbed-trailer-semi-stake-pocket 24× 24 · part
4 Rub Rail flatbed-trailer-semi-rub-rail 2× 2 · part
5 D-Ring Tie-Down flatbed-trailer-semi-d-ring 8× 8 · part
6 Cargo Strap flatbed-trailer-semi-strap 12× 12 · part

Something wrong in this list? Report a problem with this BOM.

Where the cargo securement is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks