Aluminum Body
AssemblyBonded and riveted aluminum spaceframe with composite closures. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Aluminum Body parts and their functions
7 top-level parts · 31 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Aluminum Spaceframe 3 parts | 1× | Extruded and cast aluminum frame, bonded and self-pierce riveted. |
| 2 | Door Assembly 4 parts | 2× | Frameless coupe door with soft-close latch. |
| 3 | Hood | 1× | |
| 4 | Trunk Lid | 1× | |
| 5 | Composite Fender | 2× | |
| 6 | Windshield | 1× | Laminated safety-glass panel bonded into the front aperture of the body that protects the occupants and carries the wipers and sensors. |
| 7 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Aluminum Body
7 top-level lines · 16 rows shown · 31 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Aluminum Spaceframe 3 parts | grand-tourer-car-spaceframe | 1× | 1 | 15 | assembly |
| 1.1 | Aluminum Extrusion Member | grand-tourer-car-extrusion | 8× | 8 | · | part |
| 1.2 | Aluminum Node Casting | grand-tourer-car-casting | 6× | 6 | · | part |
| 1.3 | Self-Pierce Rivet Set | grand-tourer-car-rivet-set | 1× | 1 | · | part |
| 2 | Door Assembly 4 parts | grand-tourer-car-door | 2× | 2 | 5 | assembly |
| 2.1 | Aluminum Door Shell | grand-tourer-car-door-shell | 1× | 2 | · | part |
| 2.2 | Window Regulator 2 parts | window-regulator | 1× | 2 | 2 | assembly |
| 2.2.1 | Window Motor | regulator-motor | 1× | 2 | · | part |
| 2.2.2 | Regulator Rail | regulator-rail | 1× | 2 | · | part |
| 2.3 | Door Glass | door-glass | 1× | 2 | · | part |
| 2.4 | Soft-Close Latch | grand-tourer-car-soft-close | 1× | 2 | · | part |
| 3 | Hood | grand-tourer-car-hood | 1× | 1 | · | part |
| 4 | Trunk Lid | grand-tourer-car-trunk-lid | 1× | 1 | · | part |
| 5 | Composite Fender | grand-tourer-car-fender | 2× | 2 | · | part |
| 6 | Windshield | windshield | 1× | 1 | · | part |
| 7 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the aluminum body is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |