BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Waste Container Body

Assembly

Open-top or semi-enclosed steel vessel (20–35 m³) with sloped floor and reinforced walls for bulky debris. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Waste Container Body parts and their functions

6 top-level parts · 12 parts in total · full bill of materials below
Waste Container Body parts diagram: 1 body shell, 2 body sidewalls, 3 body floor pan, 4 impact guards, 5 internal bracing, 6 o-ring set. 12 parts in 6 top-level items.
Waste Container Body parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Body Shell 1× Welded heavy-gauge (6 mm) steel with stiffeners
2 Body Sidewalls 2× Reinforced sidewalls with impact guards
3 Body Floor Pan 1× Thick steel pan (1:15 slope) with drain holes
4 Impact Guards 4× Protective corner and edge guards (polyurethane-faced)
5 Internal Bracing 2× Internal bracing preventing wall deformation
6 O-Ring Set 2× Seals around discharge gate openings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Waste Container Body

6 top-level lines · 6 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Body Shell grapple-truck-body-shell 1× 1 · part
2 Body Sidewalls grapple-truck-body-walls 2× 2 · part
3 Body Floor Pan grapple-truck-body-floor 1× 1 · part
4 Impact Guards grapple-truck-body-guards 4× 4 · part
5 Internal Bracing grapple-truck-body-ribs 2× 2 · part
6 O-Ring Set oring-set 2× 2 · part

Something wrong in this list? Report a problem with this BOM.

Where the waste container body is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks