BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Production Control Suite

Assembly

Multiple equipment racks housing video switcher (4K capable), graphics system, monitoring (multiviewer), and technical control positions. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Production Control Suite parts and their functions

6 top-level parts · 9 parts in total · full bill of materials below
Production Control Suite parts diagram: 1 video switcher, 2 graphics system, 3 monitoring display, 4 equipment rack, 5 UPS system, 6 patch panel. 9 parts in 6 top-level items.
Production Control Suite parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Video Switcher 1× 12–16 input, 4K capable
2 Graphics System 1× Graphics and lower-third overlays
3 Monitoring Display 2× Program and production monitoring
4 Equipment Rack 3× Standard 19-inch racks, shock-mounted
5 UPS System 1× UPS battery backup for control systems
6 Patch Panel 1× SDI/fiber input/output distribution

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Production Control Suite

6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Video Switcher ob-broadcast-van-video-switcher 1× 1 · part
2 Graphics System ob-broadcast-van-character-generator 1× 1 · part
3 Monitoring Display ob-broadcast-van-multiviewer-monitor 2× 2 · part
4 Equipment Rack ob-broadcast-van-equipment-racks 3× 3 · part
5 UPS System ob-broadcast-van-uninterruptible-power 1× 1 · part
6 Patch Panel ob-broadcast-van-patch-panel 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the production control suite is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks