Folding Top
AssemblySimple manual fabric top that the driver raises or lowers by hand in seconds, in keeping with the lightweight ethos. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Folding Top parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Top Fabric | 1× | Single-piece vinyl or canvas roof skin. |
| 2 | Manual Top Frame | 1× | Folding bow frame counterbalanced for one-handed operation. |
| 3 | Centre Header Latch | 1× | Single hand latch clamping the top to the windscreen. |
| 4 | Plastic Rear Window | 1× | Flexible clear window in the fabric. |
| 5 | Tonneau Boot Cover | 1× |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Folding Top
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Top Fabric | roadster-car-top-fabric | 1× | 1 | · | part |
| 2 | Manual Top Frame | roadster-car-top-frame | 1× | 1 | · | part |
| 3 | Centre Header Latch | roadster-car-header-latch | 1× | 1 | · | part |
| 4 | Plastic Rear Window | roadster-car-rear-window | 1× | 1 | · | part |
| 5 | Tonneau Boot Cover | roadster-car-top-cover | 1× | 1 | · | part |
Where the folding top is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |