BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Wiring Harness

Assembly

A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Wiring Harness parts and their functions

2 top-level parts · 51 parts in total · full bill of materials below
Wiring Harness parts diagram: 1 wire bundle, 2 connector. 51 parts in 2 assemblies.
Wiring Harness parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Wire Bundle Group of insulated conductors cut to length, terminated, and bound together to carry power and signals between the assemblies of a machine.
2 Connector 50× Mating plug-and-socket pair that joins two lengths of wiring or a cable to a board so a circuit can be assembled, serviced, and separated without soldering.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Wiring Harness

2 top-level lines · 2 rows shown · 51 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Wire Bundle wire-bundle 1 · part
2 Connector connector 50× 50 · part

Where the wiring harness is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Motherson
motherson.com ↗
Noida, IN Wiring harness & modules 1,000 sets 4–6 wks
🇮🇳Polycab
polycab.com ↗
Mumbai, IN Wires & cables 1,000 sets 4–6 wks
🇨🇳Luxshare
luxshare-ict.com ↗
Dongguan, CN Connectors & cables 1,000 sets 4–6 wks
🇨🇳Hengtong
hengtonggroup.com ↗
Suzhou, CN Cables 1,000 sets 4–6 wks
🇮🇳Finolex
finolex.com ↗
Pune, IN Wires & cables 1,000 sets 4–6 wks