Broom System
AssemblySide gutter brooms and a cylindrical main broom. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Broom System parts and their functions
4 top-level parts · 12 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Gutter Broom 2 parts | 2× | Gutter brooms |
| 2 | Main Broom 2 parts | 1× | Main broom |
| 3 | Broom Drive Motor | 3× | Broom drive motors |
| 4 | Broom Lift Cylinder | 3× | Broom lift cylinders |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Broom System
4 top-level lines · 8 rows shown · 12 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Gutter Broom 2 parts | sweeper-truck-gutter-broom | 2× | 2 | 2 | assembly |
| 1.1 | Broom Disc | sweeper-truck-broom-disc | 1× | 2 | · | part |
| 1.2 | Bristle Set | sweeper-truck-bristle-set | 1× | 2 | · | part |
| 2 | Main Broom 2 parts | sweeper-truck-main-broom | 1× | 1 | 2 | assembly |
| 2.1 | Broom Core | sweeper-truck-broom-core | 1× | 1 | · | part |
| 2.2 | Bristle Set | sweeper-truck-bristle-set | 1× | 1 | · | part |
| 3 | Broom Drive Motor | sweeper-truck-broom-motor | 3× | 3 | · | part |
| 4 | Broom Lift Cylinder | sweeper-truck-broom-lift | 3× | 3 | · | part |
Where the broom system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |