Cargo Tank
AssemblyMulti-compartment elliptical liquid tank with baffles and safety fittings. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cargo Tank parts and their functions
11 top-level parts · 40 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tank Shell | 1× | elliptical barrel |
| 2 | Bulkhead | 3× | compartment dividers |
| 3 | Surge Baffle | 4× | surge baffles |
| 4 | Manhole Hatch 3 parts | 4× | one per compartment |
| 5 | Vapor Vent | 4× | Pressure-vacuum vent relieving tank pressure during fill and discharge. |
| 6 | Spill Dam | 1× | Raised collar around the hatches draining overfill to a controlled outlet. |
| 7 | Internal Foot Valve 2 parts | 4× | internal emergency valves |
| 8 | Sight Gauge | 4× | External level gauge showing compartment fill. |
| 9 | Grounding Reel | 1× | Static bonding cable reel clipped to grade during transfer. |
| 10 | Walkway | 1× | Non-slip catwalk along the tank top. |
| 11 | Access Ladder | 1× | Rear ladder to the tank-top walkway. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cargo Tank
11 top-level lines · 16 rows shown · 40 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tank Shell | tanker-truck-tank-shell | 1× | 1 | · | part |
| 2 | Bulkhead | tanker-truck-bulkhead | 3× | 3 | · | part |
| 3 | Surge Baffle | tanker-truck-baffle | 4× | 4 | · | part |
| 4 | Manhole Hatch 3 parts | tanker-truck-manhole | 4× | 4 | 3 | assembly |
| 4.1 | Manhole Cover | tanker-truck-manhole-cover | 1× | 4 | · | part |
| 4.2 | O-Ring Set | oring-set | 1× | 4 | · | part |
| 4.3 | Fastener Set | fastener-set | 1× | 4 | · | part |
| 5 | Vapor Vent | tanker-truck-vapor-vent | 4× | 4 | · | part |
| 6 | Spill Dam | tanker-truck-spill-dam | 1× | 1 | · | part |
| 7 | Internal Foot Valve 2 parts | tanker-truck-foot-valve | 4× | 4 | 2 | assembly |
| 7.1 | Foot Valve Body | tanker-truck-foot-valve-body | 1× | 4 | · | part |
| 7.2 | O-Ring Set | oring-set | 1× | 4 | · | part |
| 8 | Sight Gauge | tanker-truck-sight-gauge | 4× | 4 | · | part |
| 9 | Grounding Reel | tanker-truck-grounding-reel | 1× | 1 | · | part |
| 10 | Walkway | tanker-truck-walkway | 1× | 1 | · | part |
| 11 | Access Ladder | tanker-truck-ladder | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cargo tank is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |