BOMwiki the bill-of-materials encyclopedia
30,441,948 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

CVT

Assembly

A belt-and-pulley continuously variable transmission whose pulley faces move to vary ratio smoothly, with high, low, neutral, and reverse range selection. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

CVT parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
CVT parts diagram: 1 primary clutch, 2 secondary clutch, 3 drive belt, 4 range gearbox, 5 gearbox housing. 5 parts in 5 top-level items.
CVT parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Primary Clutch 1× Primary drive clutch
2 Secondary Clutch 1× Driven clutch
3 Drive Belt 1× CVT belt
4 Range Gearbox 1× Range gearbox
5 Gearbox Housing 1× CVT housing

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for CVT

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Primary Clutch utv-primary-clutch 1× 1 · part
2 Secondary Clutch utv-secondary-clutch 1× 1 · part
3 Drive Belt drive-belt 1× 1 · part
4 Range Gearbox utv-gear-selector 1× 1 · part
5 Gearbox Housing gearbox-housing 1× 1 · part

Where the CVT is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks