4WD Drivetrain
AssemblyThe axle system that delivers CVT output to all four wheels, with selectable front drive and a locking front differential for low-traction ground. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
4WD Drivetrain parts and their functions
5 top-level parts · 13 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Front Differential | 1× | Locking front differential |
| 2 | Rear Differential | 1× | Rear differential |
| 3 | Propeller Shaft | 1× | Front propeller shaft |
| 4 | CV Axle | 4× | CV drive axles |
| 5 | Oil Seal | 6× | Axle and diff seals |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for 4WD Drivetrain
5 top-level lines · 5 rows shown · 13 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Front Differential | utv-front-diff | 1× | 1 | · | part |
| 2 | Rear Differential | utv-rear-diff | 1× | 1 | · | part |
| 3 | Propeller Shaft | utv-prop-shaft | 1× | 1 | · | part |
| 4 | CV Axle | utv-cv-axle | 4× | 4 | · | part |
| 5 | Oil Seal | oil-seal | 6× | 6 | · | part |
Where the 4WD drivetrain is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.01–$2. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| sundram.com ↗ | Chennai, IN | Fasteners | 10,000 pcs | 3–5 wks |
| lpsindia.com ↗ | Rohtak, IN | Fasteners | 10,000 pcs | 3–5 wks |
| escort-fastener.com ↗ | Suzhou, CN | Fasteners | 10,000 pcs | 3–5 wks |
| tbfastener.com ↗ | Shanghai, CN | Fasteners | 10,000 pcs | 3–5 wks |
| sterlingtools.in ↗ | Faridabad, IN | Fasteners | 10,000 pcs | 3–5 wks |