Real-Time Controller
AssemblyHigh-speed FPGA or GPU system processing wavefront sensor data and commanding deformable mirror at >500 Hz. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Real-Time Controller parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | FPGA Card | 1× | Xilinx or Altera FPGA board with real-time Linux OS |
| 2 | GPU Accelerator | 1× | Optional NVIDIA GPU for modal reconstruction |
| 3 | Wavefront Software | 1× | Zernike polynomial fitting and mirror control firmware |
| 4 | Memory Module | 1× | High-speed DDR4 memory (16–32 GB) for buffer storage |
| 5 | Power Supply | 1× | 12 V high-current supply for FPGA and GPU |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Real-Time Controller
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | FPGA Card | adaptive-optics-fpga-card | 1× | 1 | · | part |
| 2 | GPU Accelerator | adaptive-optics-gpu-accelerator | 1× | 1 | · | part |
| 3 | Wavefront Software | adaptive-optics-wavefront-software | 1× | 1 | · | part |
| 4 | Memory Module | adaptive-optics-memory-ddr4 | 1× | 1 | · | part |
| 5 | Power Supply | power-supply | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the real-time controller is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳JLCPCB
jlcpcb.com ↗
|
Shenzhen, CN | PCB fabrication | 100 pcs | 2–4 wks |
|
🇨🇳PCBWay
pcbway.com ↗
|
Shenzhen, CN | PCB fab & assembly | 100 pcs | 2–4 wks |
| scc.com.cn ↗ | Shenzhen, CN | PCB manufacturer | 100 pcs | 2–4 wks |
| shogini.com ↗ | Mumbai, IN | PCB manufacturer | 100 pcs | 2–4 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 100 pcs | 2–4 wks |