BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Block Removal / Unblocking Tool

Assembly

Thermal or mechanical device separating cooled block from lens after adhesive sets. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Block Removal / Unblocking Tool parts and their functions

3 top-level parts · 3 parts in total · full bill of materials below
Block Removal / Unblocking Tool parts diagram: 1 thermal adhesive release, 2 block pusher plate, 3 collet release solenoid. 3 parts in 3 top-level items.
Block Removal / Unblocking Tool parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Thermal Adhesive Release 1× Heating element briefly warming block-lens interface to soften adhesive for separation
2 Block Pusher Plate 1× Spring-loaded or pneumatic pusher plate removing block from back of lens
3 Collet Release Solenoid 1× Pneumatic solenoid releasing lens from holding collet once block is removed

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Block Removal / Unblocking Tool

3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Thermal Adhesive Release lens-blocker-thermal-driver 1× 1 · part
2 Block Pusher Plate lens-blocker-mechanical-pusher 1× 1 · part
3 Collet Release Solenoid lens-blocker-collet-release 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the block removal / unblocking tool is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks