Spindle Assembly
AssemblyTwo high-speed spindles (one rough, one finish) with diamond grit wheels and air-bearing shafts. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Spindle Assembly parts and their functions
6 top-level parts · 9 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Spindle Shaft | 2× | Precision ground steel shaft with ceramic air bearing pads |
| 2 | Diamond Wheel | 2× | Segmented diamond grit bonded in resin, 80–120 grit rough and 400–600 grit finish |
| 3 | Spindle Motor | 1× | Three-phase AC induction motor, 3–5 kW, 12,000–15,000 rpm max |
| 4 | Motor Housing | 1× | Cast aluminum enclosure with thermal cutout |
| 5 | Hall Sensor | 2× | RPM feedback for spindle synchronization |
| 6 | O-Ring Set | 1× | Seal kit for spindle bearings and coolant isolation |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Spindle Assembly
6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Spindle Shaft | lens-edger-spindle-shaft | 2× | 2 | · | part |
| 2 | Diamond Wheel | lens-edger-diamond-wheel | 2× | 2 | · | part |
| 3 | Spindle Motor | lens-edger-spindle-motor | 1× | 1 | · | part |
| 4 | Motor Housing | motor-housing | 1× | 1 | · | part |
| 5 | Hall Sensor | hall-sensor | 2× | 2 | · | part |
| 6 | O-Ring Set | oring-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the spindle assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |