Baseplate Assembly
AssemblyAluminum baseplate with adjustable lens clamp and 15 mm rod connection points. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Baseplate Assembly parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Baseplate Body | 1× | Die-cast aluminum baseplate, 200 x 150 x 80 mm |
| 2 | Lens Clamp Lever | 1× | Quick-action lever clamp gripping lens barrel |
| 3 | Clamp Pad Ring | 1× | Rubber-lined clamping ring preventing lens damage |
| 4 | Rod Support Block | 1× | Aluminum block mounting dual 15 mm rod sockets |
| 5 | Fastener Set | 1× | M6 cap screws and locking nuts assembling baseplate sections |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Baseplate Assembly
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Baseplate Body | matte-box-system-baseplate-body | 1× | 1 | · | part |
| 2 | Lens Clamp Lever | matte-box-system-lens-clamp | 1× | 1 | · | part |
| 3 | Clamp Pad Ring | matte-box-system-clamp-pad-ring | 1× | 1 | · | part |
| 4 | Rod Support Block | matte-box-system-rod-support-block | 1× | 1 | · | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the baseplate assembly is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |