BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Coach Body

Assembly

A welded aluminium superstructure clad in fibreglass, with windows, entry door, and slide-out rooms that extend the floor plan when parked. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Coach Body parts and their functions

7 top-level parts · 64 parts in total · full bill of materials below
Coach Body parts diagram: 1 body cage, 2 sidewall panel, 3 roof panel, 4 slide-out room, 5 entry door, 6 coach window, 7 fastener set. 64 parts in 7 top-level items.
Coach Body parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Body Cage 1× Welded aluminium frame
2 Sidewall Panel 2× Laminated fibreglass walls
3 Roof Panel 1× One-piece fibreglass roof with raceways for AC and vents.
4 Slide-Out Room 5 parts 2× Slide-out rooms
5 Entry Door 1× Insulated entry door with lock, screen, and steps.
6 Coach Window 8× Dual-pane tinted window with frame and latch.
7 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Coach Body

7 top-level lines · 19 rows shown · 64 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Body Cage motorhome-rv-body-cage 1× 1 · part
2 Sidewall Panel motorhome-rv-sidewall 2× 2 · part
3 Roof Panel motorhome-rv-roof-panel 1× 1 · part
4 Slide-Out Room 5 parts motorhome-rv-slide-out 2× 2 25 assembly
4.1 Slide Box motorhome-rv-slide-box 1× 2 · part
4.2 Stator Assembly 3 parts stator-assembly 1× 2 3 assembly
4.2.1 Stator Core (laminations) stator-core 1× 2 · part
4.2.2 Copper Winding copper-winding 1× 2 · part
4.2.3 Slot Insulation stator-insulation 1× 2 · part
4.3 Rotor Assembly 4 parts rotor-assembly 1× 2 19 assembly
4.3.1 Rotor Shaft rotor-shaft 1× 2 · part
4.3.2 Rotor Core rotor-core 1× 2 · part
4.3.3 Neodymium Magnet neodymium-magnet 16× 32 · part
4.3.4 Ball Bearing ball-bearing 1× 2 · part
4.4 Helical Gear Pair gear-pair 1× 2 · part
4.5 Slide Seal motorhome-rv-slide-seal 1× 2 · part
5 Entry Door motorhome-rv-entry-door 1× 1 · part
6 Coach Window motorhome-rv-window 8× 8 · part
7 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the coach body is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks