Coach Body
AssemblyA welded aluminium superstructure clad in fibreglass, with windows, entry door, and slide-out rooms that extend the floor plan when parked. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Coach Body parts and their functions
7 top-level parts · 64 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Body Cage | 1× | Welded aluminium frame |
| 2 | Sidewall Panel | 2× | Laminated fibreglass walls |
| 3 | Roof Panel | 1× | One-piece fibreglass roof with raceways for AC and vents. |
| 4 | Slide-Out Room 5 parts | 2× | Slide-out rooms |
| 5 | Entry Door | 1× | Insulated entry door with lock, screen, and steps. |
| 6 | Coach Window | 8× | Dual-pane tinted window with frame and latch. |
| 7 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Coach Body
7 top-level lines · 19 rows shown · 64 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Body Cage | motorhome-rv-body-cage | 1× | 1 | · | part |
| 2 | Sidewall Panel | motorhome-rv-sidewall | 2× | 2 | · | part |
| 3 | Roof Panel | motorhome-rv-roof-panel | 1× | 1 | · | part |
| 4 | Slide-Out Room 5 parts | motorhome-rv-slide-out | 2× | 2 | 25 | assembly |
| 4.1 | Slide Box | motorhome-rv-slide-box | 1× | 2 | · | part |
| 4.2 | Stator Assembly 3 parts | stator-assembly | 1× | 2 | 3 | assembly |
| 4.2.1 | Stator Core (laminations) | stator-core | 1× | 2 | · | part |
| 4.2.2 | Copper Winding | copper-winding | 1× | 2 | · | part |
| 4.2.3 | Slot Insulation | stator-insulation | 1× | 2 | · | part |
| 4.3 | Rotor Assembly 4 parts | rotor-assembly | 1× | 2 | 19 | assembly |
| 4.3.1 | Rotor Shaft | rotor-shaft | 1× | 2 | · | part |
| 4.3.2 | Rotor Core | rotor-core | 1× | 2 | · | part |
| 4.3.3 | Neodymium Magnet | neodymium-magnet | 16× | 32 | · | part |
| 4.3.4 | Ball Bearing | ball-bearing | 1× | 2 | · | part |
| 4.4 | Helical Gear Pair | gear-pair | 1× | 2 | · | part |
| 4.5 | Slide Seal | motorhome-rv-slide-seal | 1× | 2 | · | part |
| 5 | Entry Door | motorhome-rv-entry-door | 1× | 1 | · | part |
| 6 | Coach Window | motorhome-rv-window | 8× | 8 | · | part |
| 7 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the coach body is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |