Film Transport Mechanism
AssemblyFilm advance lever, frame counter, and rewind mechanism for 35 mm roll film. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Film Transport Mechanism parts and their functions
6 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Film Advance Lever | 1× | Crank lever advancing film by one frame (24×36 mm) |
| 2 | Sprocket Wheels | 1× | Precision sprocket wheels engaging film perforations |
| 3 | Frame Counter | 1× | Dial indicating frame number (24 or 36) |
| 4 | Film Rewind Knob | 1× | Knob and mechanism for rewinding exposed film |
| 5 | Auto Shutter Cock Linkage | 1× | Automatic coupling cocking shutter during film advance |
| 6 | Fastener Set | 1× | Transport mechanism fasteners |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Film Transport Mechanism
6 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Film Advance Lever | rangefinder-film-advance-lever | 1× | 1 | · | part |
| 2 | Sprocket Wheels | rangefinder-sprocket-wheels | 1× | 1 | · | part |
| 3 | Frame Counter | rangefinder-frame-counter | 1× | 1 | · | part |
| 4 | Film Rewind Knob | rangefinder-film-rewind-knob | 1× | 1 | · | part |
| 5 | Auto Shutter Cock Linkage | rangefinder-shutter-cock-linkage | 1× | 1 | · | part |
| 6 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the film transport mechanism is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |