BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Primary Mirror Cell

Assembly

Holds the parabolic primary mirror with spring-loaded collimation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Primary Mirror Cell parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Primary Mirror Cell parts diagram: 1 parabolic primary mirror, 2 mirror cell frame & backplate, 3 coil spring, 4 fastener set. 6 parts in 4 top-level items.
Primary Mirror Cell parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Parabolic Primary Mirror 1×
2 Mirror Cell Frame & Backplate 1×
3 Coil Spring 3× Collimation springs
4 Fastener Set 1× Collimation screws

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Primary Mirror Cell

4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Parabolic Primary Mirror telescope-primary-mirror 1× 1 · part
2 Mirror Cell Frame & Backplate telescope-cell-frame 1× 1 · part
3 Coil Spring coil-spring 3× 3 · part
4 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the primary mirror cell is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$500. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳CATL
catl.com ↗
Ningde, CN Li-ion cell & pack maker 5,000 cells 8–12 wks
🇨🇳EVE Energy
evebattery.com ↗
Huizhou, CN Li-ion cell maker 5,000 cells 8–12 wks
🇮🇳Amara Raja
amararaja.com ↗
Tirupati, IN Batteries & energy 5,000 cells 8–12 wks
🇸🇬Durapower
durapowergroup.com ↗
Singapore Li-ion battery systems 5,000 cells 8–12 wks
🇨🇳BYD
byd.com ↗
Shenzhen, CN EV & battery manufacturer 5,000 cells 8–12 wks