Control Linkages
AssemblyPush-rods, levers, and rotary shafts that pass through glanded penetrations to reach every camera control. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Control Linkages parts and their functions
6 top-level parts · 46 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Shutter Release Lever | 1× | Trigger-style lever at the right grip that drives a rod onto the camera shutter button. |
| 2 | Button Push-Rod | 12× | Button push-rods |
| 3 | Rotary Control Shaft | 4× | Dial and zoom shafts |
| 4 | Control Gland | 16× | Shaft seal glands |
| 5 | Coil Spring | 12× | Push-rod return springs |
| 6 | Mode Dial Gear Train | 1× | Small gear set translating an offset external knob onto the camera mode dial. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Control Linkages
6 top-level lines · 6 rows shown · 46 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Shutter Release Lever | underwater-camera-housing-shutter-lever | 1× | 1 | · | part |
| 2 | Button Push-Rod | underwater-camera-housing-pushrod | 12× | 12 | · | part |
| 3 | Rotary Control Shaft | underwater-camera-housing-rotary-shaft | 4× | 4 | · | part |
| 4 | Control Gland | underwater-camera-housing-gland | 16× | 16 | · | part |
| 5 | Coil Spring | coil-spring | 12× | 12 | · | part |
| 6 | Mode Dial Gear Train | underwater-camera-housing-mode-gears | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the control linkages is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |