Base Platform
AssemblyHeavy-duty dolly or crane base structure with motor mounts. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Base Platform parts and their functions
7 top-level parts · 23 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Frame Structure | 1× | Aluminum extrusion frame 2m × 1.5m |
| 2 | Dolly Wheel | 4× | Pneumatic wheel 400mm diameter |
| 3 | Hydraulic Parking Brake | 4× | Hydraulic parking brake per wheel |
| 4 | Dolly Drive Motor | 2× | BLDC 24V 500W for dolly drive |
| 5 | Encoder | 2× | Wheel position encoder |
| 6 | Ball Bearing | 8× | Dolly wheel bearings |
| 7 | Fastener Set | 2× | Frame and brake assembly bolts |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Base Platform
7 top-level lines · 7 rows shown · 23 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Frame Structure | camera-motion-control-rig-frame | 1× | 1 | · | part |
| 2 | Dolly Wheel | camera-motion-control-rig-dolly-wheel | 4× | 4 | · | part |
| 3 | Hydraulic Parking Brake | camera-motion-control-rig-brake | 4× | 4 | · | part |
| 4 | Dolly Drive Motor | camera-motion-control-rig-base-motor | 2× | 2 | · | part |
| 5 | Encoder | encoder | 2× | 2 | · | part |
| 6 | Ball Bearing | ball-bearing | 8× | 8 | · | part |
| 7 | Fastener Set | fastener-set | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the base platform is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |