BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Drain and Return Line

Assembly

Gravity-fed piping system collecting standpipe outflow from all trays back to the central reservoir. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Drain and Return Line parts and their functions

4 top-level parts · 7 parts in total · full bill of materials below
Drain and Return Line parts diagram: 1 return header pipe, 2 return tray connector, 3 return check valve, 4 overflow sump. 7 parts in 4 top-level items.
Drain and Return Line parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Return Header Pipe 1× 25–32 mm main header running length of tray array
2 Return Tray Connector 4× 16–20 mm flexible tubing from each tray standpipe
3 Return Check Valve 1× One-way check valve preventing backflow to trays
4 Overflow Sump 1× Catch basin with overflow to floor drain if needed

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Drain and Return Line

4 top-level lines · 4 rows shown · 7 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Return Header Pipe ebb-flow-system-return-header-pipe 1× 1 · part
2 Return Tray Connector ebb-flow-system-return-tray-connector 4× 4 · part
3 Return Check Valve ebb-flow-system-return-valve 1× 1 · part
4 Overflow Sump ebb-flow-system-overflow-sump 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the drain and return line is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks