Grain Hopper
AssemblyWelded steel tank holding 1000-1700 bushels with steep cone bottom for clean-out. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Grain Hopper parts and their functions
7 top-level parts · 13 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Tank Shell | 1× | Welded side and end panels |
| 2 | Cone Floor | 1× | Sloped sump floor |
| 3 | Roll Tarp | 1× | Weather cover |
| 4 | Sight Window | 2× | Fill level windows |
| 5 | Access Ladder | 1× | Access ladder and platform |
| 6 | Sheet Metal Panel | 6× | Formed steel wall panels |
| 7 | Fastener Set | 1× | Structural bolting |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Grain Hopper
7 top-level lines · 7 rows shown · 13 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Tank Shell | grain-cart-tracked-tank-shell | 1× | 1 | · | part |
| 2 | Cone Floor | grain-cart-tracked-cone-floor | 1× | 1 | · | part |
| 3 | Roll Tarp | grain-cart-tracked-roll-tarp | 1× | 1 | · | part |
| 4 | Sight Window | grain-cart-tracked-sight-window | 2× | 2 | · | part |
| 5 | Access Ladder | grain-cart-tracked-ladder | 1× | 1 | · | part |
| 6 | Sheet Metal Panel | sheet-panel | 6× | 6 | · | part |
| 7 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the grain hopper is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |