Lighting Controller
AssemblyProgrammable schedule activating/dimming supplemental LED or HPS lamps; typically two channels (main lights and seedling lights). A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Lighting Controller parts and their functions
4 top-level parts · 6 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Light Contactor | 2× | High-current relays switching 6–12 kW lamp loads |
| 2 | 0-10V Dimmer Output | 2× | 0–10V PWM output for dimmable LED ballasts |
| 3 | Photoperiod Timer | 1× | Astronomical clock adjusting on/off times seasonally |
| 4 | Light Intensity Sensor | 1× | Optional feedback to reduce lamps if natural light sufficient |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Lighting Controller
4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Light Contactor | greenhouse-climate-computer-light-contactor | 2× | 2 | · | part |
| 2 | 0-10V Dimmer Output | greenhouse-climate-computer-0-10v-dimmer | 2× | 2 | · | part |
| 3 | Photoperiod Timer | greenhouse-climate-computer-photoperiod-timer | 1× | 1 | · | part |
| 4 | Light Intensity Sensor | greenhouse-climate-computer-light-intensity-sensor | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the lighting controller is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $1–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳JLCPCB
jlcpcb.com ↗
|
Shenzhen, CN | PCB fabrication | 100 pcs | 2–4 wks |
|
🇨🇳PCBWay
pcbway.com ↗
|
Shenzhen, CN | PCB fab & assembly | 100 pcs | 2–4 wks |
| scc.com.cn ↗ | Shenzhen, CN | PCB manufacturer | 100 pcs | 2–4 wks |
| shogini.com ↗ | Mumbai, IN | PCB manufacturer | 100 pcs | 2–4 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 100 pcs | 2–4 wks |