BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Alignment and Guidance System

Assembly

Alignment switches, a control panel, and a steering reference keeping the machine straight and square. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Alignment and Guidance System parts and their functions

4 top-level parts · 24 parts in total · full bill of materials below
Alignment and Guidance System parts diagram: 1 alignment switch, 2 control panel, 3 guidance sensor, 4 steering actuator. 24 parts in 4 top-level items.
Alignment and Guidance System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Alignment Switch 5× Switch between adjacent spans sensing tower lead or lag
2 Control Panel 5 parts 1× Main control panel with the PLC and operator interface
3 Guidance Sensor 1× Furrow follower, buried-cable, or GPS steering reference
4 Steering Actuator 1× Actuator steering the lead unit onto the guidance line

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Alignment and Guidance System

4 top-level lines · 12 rows shown · 24 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Alignment Switch lateral-move-irrigator-alignment-switch 5× 5 · part
2 Control Panel 5 parts lateral-move-irrigator-control-panel 1× 1 17 assembly
2.1 Programmable Controller 3 parts lateral-move-irrigator-plc 1× 1 3 assembly
2.1.1 Bare PCB pcb-bare 1× 1 · part
2.1.2 Microcontroller mcu 1× 1 · part
2.1.3 SMD Passive (R/C/L) smd-passives 1× 1 · part
2.2 LCD Panel lcd-panel 1× 1 · part
2.3 Relay relay 6× 6 · part
2.4 Motor Contactor lateral-move-irrigator-contactor 6× 6 · part
2.5 Percent Timer lateral-move-irrigator-percent-timer 1× 1 · part
3 Guidance Sensor lateral-move-irrigator-guidance-sensor 1× 1 · part
4 Steering Actuator lateral-move-irrigator-steer-actuator 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the alignment and guidance system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks