BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Entrance Gate

Assembly

Single swinging gate controls animal entry onto weighbridge platform. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Entrance Gate parts and their functions

6 top-level parts · 9 parts in total · full bill of materials below
Entrance Gate parts diagram: 1 gate frame, 2 gate bars, 3 gate hinges, 4 gate pivot pin, 5 gate latch, 6 fastener set. 9 parts in 6 top-level items.
Entrance Gate parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Gate Frame 1× Tubular steel gate structure
2 Gate Bars 3× Horizontal bars prevent climbing
3 Gate Hinges 2× Heavy-duty hinges for swing motion
4 Gate Pivot Pin 1× Removable pin allows gate removal
5 Gate Latch 1× Manual or solenoid latch holds gate closed
6 Fastener Set 1× Hinge and bar fasteners

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Entrance Gate

6 top-level lines · 6 rows shown · 9 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Gate Frame livestock-scale-gate-frame 1× 1 · part
2 Gate Bars livestock-scale-gate-bars 3× 3 · part
3 Gate Hinges livestock-scale-gate-hinges 2× 2 · part
4 Gate Pivot Pin livestock-scale-gate-pivot-pin 1× 1 · part
5 Gate Latch livestock-scale-gate-latch 1× 1 · part
6 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the entrance gate is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks