BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Scraper Blade

Assembly

Low-profile steel or rubber blade dragging manure across the floor to the pit. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Scraper Blade parts and their functions

4 top-level parts · 4 parts in total · full bill of materials below
Scraper Blade parts diagram: 1 blade insert, 2 blade mounting, 3 cable attachment, 4 fastener set. 4 parts in 4 top-level items.
Scraper Blade parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Blade Insert 1× Composite or rubber blade (high-wear material), 1-2 mm thick, replaceable.
2 Blade Mounting 1× Steel frame bolting the blade to the cable tether, angled for efficient scraping.
3 Cable Attachment 1× Loop or clevis connecting the blade bracket to the moving cable.
4 Fastener Set 1× Bolts, nuts, and washers.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Scraper Blade

4 top-level lines · 4 rows shown · 4 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Blade Insert manure-scraper-blade-element 1× 1 · part
2 Blade Mounting manure-scraper-blade-bracket 1× 1 · part
3 Cable Attachment manure-scraper-blade-connector 1× 1 · part
4 Fastener Set fastener-set 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the scraper blade is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks