Cable System
AssemblyContinuous loop steel wire rope guided by fixed rails and pulleys along the barn floor. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Cable System parts and their functions
5 top-level parts · 7 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Main Cable | 1× | Continuous loop wire rope, 3/8 - 1/2" diameter, running the full barn length. |
| 2 | Guide Rail | 1× | Fixed steel or aluminum channel mounted on the barn floor, guiding the cable path. |
| 3 | Pulley | 2× | Sheave blocks at each end of the barn, redirecting the cable loop (return and drive paths). |
| 4 | Cable Tensioner | 1× | Spring-loaded or turnbuckle adjuster maintaining cable tension within 2000-4000 lbf. |
| 5 | Fastener Set | 2× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Cable System
5 top-level lines · 5 rows shown · 7 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Main Cable | manure-scraper-main-cable | 1× | 1 | · | part |
| 2 | Guide Rail | manure-scraper-guide-rail | 1× | 1 | · | part |
| 3 | Pulley | manure-scraper-pulley | 2× | 2 | · | part |
| 4 | Cable Tensioner | manure-scraper-cable-tensioner | 1× | 1 | · | part |
| 5 | Fastener Set | fastener-set | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the cable system is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.10–$30. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| motherson.com ↗ | Noida, IN | Wiring harness & modules | 1,000 sets | 4–6 wks |
|
🇮🇳Polycab
polycab.com ↗
|
Mumbai, IN | Wires & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Luxshare
luxshare-ict.com ↗
|
Dongguan, CN | Connectors & cables | 1,000 sets | 4–6 wks |
|
🇨🇳Hengtong
hengtonggroup.com ↗
|
Suzhou, CN | Cables | 1,000 sets | 4–6 wks |
|
🇮🇳Finolex
finolex.com ↗
|
Pune, IN | Wires & cables | 1,000 sets | 4–6 wks |