Collection Pit
AssemblyBelow-floor sump collecting scraped manure and liquid for periodic removal. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Collection Pit parts and their functions
5 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Pit Walls | 1× | Concrete block or poured concrete structure, 1.5-2.5 m deep, beneath the scraper terminal. |
| 2 | Pit Floor | 1× | Concrete slab, sloped toward a drain sump for liquid collection and removal. |
| 3 | Drain Sump | 1× | Below-floor collection tank with submersible pump outlet for liquid manure transfer. |
| 4 | Manure Gate | 1× | Hinged or slide gate separating the scraper pit from the barn floor, opened for tanker loading. |
| 5 | Fastener Set | 1× | Bolts, nuts, and washers. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Collection Pit
5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Pit Walls | manure-scraper-pit-walls | 1× | 1 | · | part |
| 2 | Pit Floor | manure-scraper-pit-floor | 1× | 1 | · | part |
| 3 | Drain Sump | manure-scraper-pit-drain | 1× | 1 | · | part |
| 4 | Manure Gate | manure-scraper-pit-gate | 1× | 1 | · | part |
| 5 | Fastener Set | fastener-set | 1× | 1 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the collection pit is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |