BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Operator Controls

Assembly

The seat station and valves that creep the machine and run the broom and blower. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Operator Controls parts and their functions

7 top-level parts · 12 parts in total · full bill of materials below
Operator Controls parts diagram: 1 bare PCB, 2 microcontroller, 3 drive joystick, 4 valve bank, 5 dust sensor, 6 connector, 7 wire bundle. 12 parts in 7 assemblies.
Operator Controls parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bare PCB Controller board
2 Microcontroller Single-chip microcontroller combining a processor core, flash memory, RAM, and peripherals such as timers, ADCs, and serial ports to run the device's control firmware.
3 Drive Joystick Drive joystick
4 Valve Bank Valve bank
5 Dust Sensor Dust monitor
6 Connector Mating plug-and-socket pair that joins two lengths of wiring or a cable to a board so a circuit can be assembled, serviced, and separated without soldering.
7 Wire Bundle Group of insulated conductors cut to length, terminated, and bound together to carry power and signals between the assemblies of a machine.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Operator Controls

7 top-level lines · 7 rows shown · 12 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bare PCB pcb-bare 1 · part
2 Microcontroller mcu 1 · part
3 Drive Joystick nut-harvester-sweeper-joystick 1 · part
4 Valve Bank nut-harvester-sweeper-valve-bank 1 · part
5 Dust Sensor nut-harvester-sweeper-dust-sensor 1 · part
6 Connector connector 6 · part
7 Wire Bundle wire-bundle 1 · part

Where the operator controls is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks