Discharge Auger
AssemblySpiral screw conveyor moving cut silage from the arm tip into the blower inlet. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Discharge Auger parts and their functions
4 top-level parts · 5 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Auger Tube | 1× | Steel tube housing the screw flight, 4-6 m length, sloped upward. |
| 2 | Screw Flight | 1× | Helical steel ribbon wound around a central shaft, conveying material at 10-20 m/min. |
| 3 | Auger Motor | 1× | Hydraulic motor (10-20 cc/rev) driven by tractor PTO flow. |
| 4 | Auger Bearing | 2× | Component of the silo unloader. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Discharge Auger
4 top-level lines · 4 rows shown · 5 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Auger Tube | silo-unloader-auger-tube | 1× | 1 | · | part |
| 2 | Screw Flight | silo-unloader-auger-flight | 1× | 1 | · | part |
| 3 | Auger Motor | silo-unloader-auger-motor | 1× | 1 | · | part |
| 4 | Auger Bearing | silo-unloader-auger-bearing | 2× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the discharge auger is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |