BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Growing Tier

Assembly

Individual 1.2m × 0.6m bed with food-grade plastic basin, drain port, and plant support trays. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Growing Tier parts and their functions

4 top-level parts · 51 parts in total · full bill of materials below
Growing Tier parts diagram: 1 tier basin, 2 drain assembly, 3 plant support tray, 4 plant basket clip. 51 parts in 4 top-level items.
Growing Tier parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Tier Basin 1× Polypropylene or polystyrene growing bed
2 Drain Assembly 1× Valve and return line
3 Plant Support Tray 1× Foam insert with 36–48 plant sites
4 Plant Basket Clip 48× Hold net pots in plant sites

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Growing Tier

4 top-level lines · 4 rows shown · 51 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Tier Basin vertical-farm-rack-tier-basin 1× 1 · part
2 Drain Assembly vertical-farm-rack-drain-assembly 1× 1 · part
3 Plant Support Tray vertical-farm-rack-plant-support-tray 1× 1 · part
4 Plant Basket Clip vertical-farm-rack-basket-clips 48× 48 · part

Something wrong in this list? Report a problem with this BOM.

Where the growing tier is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks