BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Feed Roller Train

Assembly

A series of opposed rollers conveying the cut cane back to the chopper while shaking out loose soil. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Feed Roller Train parts and their functions

3 top-level parts · 46 parts in total · full bill of materials below
Feed Roller Train parts diagram: 1 feed roller, 2 butt-lifter rollers, 3 feed drive. 46 parts in 3 assemblies.
Feed Roller Train parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Feed Roller 3 parts Feed rollers
2 Butt-Lifter Rollers Butt-lifter rollers
3 Feed Drive 3 parts Feed roller drive

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Feed Roller Train

3 top-level lines · 9 rows shown · 46 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Feed Roller 3 parts cane-harvester-feed-roller 8 5 assembly
1.1 Ball Bearing ball-bearing 16 · part
1.2 Oil Seal oil-seal 16 · part
1.3 Coil Spring coil-spring 8 · part
2 Butt-Lifter Rollers cane-harvester-butt-lifter 1 · part
3 Feed Drive 3 parts cane-harvester-feed-drive 1 5 assembly
3.1 Helical Gear Pair gear-pair 2 · part
3.2 Gearbox Housing gearbox-housing 1 · part
3.3 Ball Bearing ball-bearing 2 · part

Where the feed roller train is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks