BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Grain Handling

Assembly

Moves clean grain to the tank and out through the unloading auger. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Grain Handling parts and their functions

3 top-level parts · 6 parts in total · full bill of materials below
Grain Handling parts diagram: 1 clean grain elevator, 2 grain tank, 3 unloading auger. 6 parts in 3 top-level items.
Grain Handling parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Clean Grain Elevator 1× Paddle-chain elevator.
2 Grain Tank 1× On-board grain storage hopper.
3 Unloading Auger 3 parts 1× Folding auger that discharges grain to a trailer.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Grain Handling

3 top-level lines · 6 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Clean Grain Elevator combine-harvester-clean-grain-elevator 1× 1 · part
2 Grain Tank combine-harvester-grain-tank 1× 1 · part
3 Unloading Auger 3 parts combine-harvester-unloading-auger 1× 1 4 assembly
3.1 Helical Gear Pair gear-pair 1× 1 · part
3.2 Ball Bearing ball-bearing 2× 2 · part
3.3 Drive Belt drive-belt 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the grain handling is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks