BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Receiving Hopper

Assembly

Top hopper and spreading auger that feed boll buggies of seed cotton in. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Receiving Hopper parts and their functions

6 top-level parts · 8 parts in total · full bill of materials below
Receiving Hopper parts diagram: 1 hopper shell, 2 spreading auger, 3 auger motor, 4 feed grille, 5 ball bearing, 6 oil seal. 8 parts in 6 assemblies.
Receiving Hopper parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Hopper Shell Sheet hopper body
2 Spreading Auger Distribution auger
3 Auger Motor Auger drive motor
4 Feed Grille Anti-bridging grille
5 Ball Bearing Auger end bearings
6 Oil Seal Auger shaft seals

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Receiving Hopper

6 top-level lines · 6 rows shown · 8 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Hopper Shell cotton-module-builder-hopper-shell 1 · part
2 Spreading Auger cotton-module-builder-spread-auger 1 · part
3 Auger Motor cotton-module-builder-auger-motor 1 · part
4 Feed Grille cotton-module-builder-feed-grille 1 · part
5 Ball Bearing ball-bearing 2 · part
6 Oil Seal oil-seal 2 · part

Where the receiving hopper is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks