BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Track Undercarriage

Assembly

Rubber-belt track system spreading 30+ ton over a long footprint to limit soil compaction. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Track Undercarriage parts and their functions

7 top-level parts · 34 parts in total · full bill of materials below
Track Undercarriage parts diagram: 1 track frame, 2 rubber track belt, 3 drive wheel, 4 mid roller, 5 track tensioner, 6 walking beam, 7 ball bearing. 34 parts in 7 top-level items.
Track Undercarriage parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Track Frame 2× Left and right track modules
2 Rubber Track Belt 2× Reinforced rubber track
3 Drive Wheel 2× Idler drive sprocket
4 Mid Roller 8× Weight-bearing rollers
5 Track Tensioner 2× Grease idler tensioner
6 Walking Beam 2× Pivoting bogie beam
7 Ball Bearing 16× Roller bearings

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Track Undercarriage

7 top-level lines · 7 rows shown · 34 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Track Frame grain-cart-tracked-track-frame 2× 2 · part
2 Rubber Track Belt grain-cart-tracked-rubber-belt 2× 2 · part
3 Drive Wheel grain-cart-tracked-drive-wheel 2× 2 · part
4 Mid Roller grain-cart-tracked-mid-roller 8× 8 · part
5 Track Tensioner grain-cart-tracked-tensioner 2× 2 · part
6 Walking Beam grain-cart-tracked-walking-beam 2× 2 · part
7 Ball Bearing ball-bearing 16× 16 · part

Something wrong in this list? Report a problem with this BOM.

Where the track undercarriage is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks