Separation Unit
AssemblyStraw walkers that shake the remaining grain out of the straw before it leaves the machine. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Separation Unit parts and their functions
3 top-level parts · 17 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Straw Walker 2 parts | 4× | Oscillating straw walkers |
| 2 | Walker Crankshaft | 1× | Walker crankshaft |
| 3 | Straw Chopper 3 parts | 1× | Rear straw chopper |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Separation Unit
3 top-level lines · 8 rows shown · 17 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Straw Walker 2 parts | grain-combine-straw-walker | 4× | 4 | 3 | assembly |
| 1.1 | Walker Tray | grain-combine-walker-tray | 1× | 4 | · | part |
| 1.2 | Ball Bearing | ball-bearing | 2× | 8 | · | part |
| 2 | Walker Crankshaft | grain-combine-walker-crank | 1× | 1 | · | part |
| 3 | Straw Chopper 3 parts | grain-combine-straw-chopper | 1× | 1 | 4 | assembly |
| 3.1 | Chopper Knife | grain-combine-chopper-knife | 1× | 1 | · | part |
| 3.2 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 3.3 | Drive Belt | drive-belt | 1× | 1 | · | part |
Where the separation unit is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |