BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Fill System

Assembly

Bucket elevator and top distributor keeping the wet bin topped up from the intake pit. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Fill System parts and their functions

4 top-level parts · 130 parts in total · full bill of materials below
Fill System parts diagram: 1 bucket elevator, 2 top distributor, 3 level probe, 4 overflow spout. 130 parts in 4 top-level items.
Fill System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Bucket Elevator 4 parts 1× Wet-side bucket elevator
2 Top Distributor 1× Garner level spreader
3 Level Probe 2× High/low level probes
4 Overflow Spout 1× Overflow return spout

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Fill System

4 top-level lines · 8 rows shown · 130 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Bucket Elevator 4 parts grain-dryer-elevator 1× 1 126 assembly
1.1 Elevator Belt grain-dryer-elevator-belt 1× 1 · part
1.2 Elevator Bucket grain-dryer-elevator-bucket 120× 120 · part
1.3 Head Pulley grain-dryer-head-pulley 1× 1 · part
1.4 Ball Bearing ball-bearing 4× 4 · part
2 Top Distributor grain-dryer-top-distributor 1× 1 · part
3 Level Probe grain-dryer-level-sensor 2× 2 · part
4 Overflow Spout grain-dryer-overflow-spout 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the fill system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks