BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Tanks and Liquid System

Assembly

Carries the spray mix and delivers it to the nozzles. The pump draws from the main tank through the suction filter and pushes the liquid through the pressure regulator, line filter and section valves to the nozzle ring, with part of the flow returned to stir the tank. Separate tanks hold clean water for rinsing the system and washing hands. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Tanks and Liquid System parts and their functions

16 top-level parts · 83 parts in total · full bill of materials below
Tanks and Liquid System parts diagram: 1 main spray tank, 2 rinse tank, 3 hand-wash tank, 4 chemical induction hopper, 5 hydraulic tank agitator, 6 tank level indicator, 7 suction filter, 8 piston-diaphragm pump, 9 pressure regulator, 10 pressure gauge, 11 pressure line filter, 12 ball valve, 13 electric section valve, 14 flow meter, 15 spray hoses and fittings, 16 hose reel and spray gun. 83 parts in 16 top-level items.
Tanks and Liquid System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Main Spray Tank 1× Holds the spray mix
2 Rinse Tank 1× Holds clean water to rinse the system after spraying
3 Hand-Wash Tank 1× Holds clean water for the operator
4 Chemical Induction Hopper 1× Lets chemical be loaded from ground level
5 Hydraulic Tank Agitator 1× Keeps the mix stirred
6 Tank Level Indicator 1× Shows how much mix is left
7 Suction Filter 1× Cleans the liquid before the pump
8 Piston-Diaphragm Pump 4 parts 1× Delivers the liquid under pressure
9 Pressure Regulator 1× Holds spraying pressure and returns surplus flow
10 Pressure Gauge 1× Shows spraying pressure
11 Pressure Line Filter 1× Cleans the liquid again before the nozzles
12 Ball Valve 9 parts 1× Main motorized on/off valve for the spray line
13 Electric Section Valve 2× Switch the upper and lower nozzle sections
14 Flow Meter 1× Measures the liquid applied. Optional
15 Spray Hoses and Fittings 1× Connect the liquid system. Set
16 Hose Reel and Spray Gun 1× Spot-sprays single trees by hand. Optional

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Tanks and Liquid System

16 top-level lines · 50 rows shown · 83 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Main Spray Tank high-altitude-sprayer-main-tank 1× 1 · part
2 Rinse Tank high-altitude-sprayer-rinse-tank 1× 1 · part
3 Hand-Wash Tank high-altitude-sprayer-hand-wash-tank 1× 1 · part
4 Chemical Induction Hopper high-altitude-sprayer-induction-hopper 1× 1 · part
5 Hydraulic Tank Agitator high-altitude-sprayer-agitator 1× 1 · part
6 Tank Level Indicator high-altitude-sprayer-level-indicator 1× 1 · part
7 Suction Filter high-altitude-sprayer-suction-filter 1× 1 · part
8 Piston-Diaphragm Pump 4 parts high-altitude-sprayer-spray-pump 1× 1 7 assembly
8.1 Pump Crankcase high-altitude-sprayer-pump-crankcase 1× 1 · part
8.2 Pump Diaphragm high-altitude-sprayer-pump-diaphragm 4× 4 · part
8.3 Pump Valve Set high-altitude-sprayer-pump-valves 1× 1 · part
8.4 Pump Pressure Accumulator high-altitude-sprayer-pump-air-chamber 1× 1 · part
9 Pressure Regulator high-altitude-sprayer-pressure-regulator 1× 1 · part
10 Pressure Gauge high-altitude-sprayer-pressure-gauge 1× 1 · part
11 Pressure Line Filter high-altitude-sprayer-line-filter 1× 1 · part
12 Ball Valve 9 parts ball-valve 1× 1 61 product
12.1 Valve Body 5 parts ball-valve-body 1× 1 5 assembly
12.1.1 Body (main half) ball-valve-body-main 1× 1 · part
12.1.2 End Cap / End Flange ball-valve-end-cap 1× 1 · part
12.1.3 Body Gasket ball-valve-body-gasket 1× 1 · part
12.1.4 O-Ring Set oring-set 1× 1 · part
12.1.5 Fastener Set fastener-set 1× 1 · part
12.2 Ball ball-valve-ball 1× 1 · part
12.3 Seat Set 2 parts ball-valve-seat-set 1× 1 4 assembly
12.3.1 PTFE Seat Ring ball-valve-seat-ring 2× 2 · part
12.3.2 Seat Spring ball-valve-seat-spring 2× 2 · part
12.4 Stem Assembly 4 parts ball-valve-stem-assembly 1× 1 4 assembly
12.4.1 Stem ball-valve-stem 1× 1 · part
12.4.2 Thrust Washer ball-valve-thrust-washer 1× 1 · part
12.4.3 Packing Gland ball-valve-gland 1× 1 · part
12.4.4 O-Ring Set oring-set 1× 1 · part
12.5 Electric Actuator 6 parts ball-valve-actuator 1× 1 40 assembly
12.5.1 Actuator Motor 4 parts + deeper › ball-valve-actuator-motor 1× 1 25 assembly
12.5.2 Reduction Gearbox 3 parts + deeper › ball-valve-actuator-gearbox 1× 1 3 assembly
12.5.3 Position Sensor ball-valve-position-sensor 1× 1 · part
12.5.4 Actuator Control Board 5 parts + deeper › ball-valve-control-board 1× 1 8 assembly
12.5.5 Limit Switch ball-valve-limit-switch 2× 2 · part
12.5.6 Actuator Housing ball-valve-actuator-housing 1× 1 · part
12.6 Mounting Kit 4 parts ball-valve-mounting-kit 1× 1 4 assembly
12.6.1 Mounting Bracket ball-valve-bracket 1× 1 · part
12.6.2 ISO 5211 Pad ball-valve-iso-pad 1× 1 · part
12.6.3 Stem Coupler ball-valve-coupler 1× 1 · part
12.6.4 Fastener Set fastener-set 1× 1 · part
12.7 Handle / Lever ball-valve-handle 1× 1 · part
12.8 Position Indicator ball-valve-position-indicator 1× 1 · part
12.9 Fastener Set fastener-set 1× 1 · part
13 Electric Section Valve high-altitude-sprayer-section-valve 2× 2 · part
14 Flow Meter high-altitude-sprayer-flow-meter 1× 1 · part
15 Spray Hoses and Fittings high-altitude-sprayer-spray-hoses 1× 1 · part
16 Hose Reel and Spray Gun high-altitude-sprayer-hose-reel-gun 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the tanks and liquid system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks