BOMwiki the bill-of-materials encyclopedia
30,441,950 parts mapped · 192,925 items

This page is machine-generated and unverified (what this means). Treat details as provisional. If you know this hardware, weigh in or correct it directly with Edit.

Discussion History

Ridging Body

Assembly

The covering discs and shaper that close the furrow and form the ridge the crop grows in. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Ridging Body parts and their functions

4 top-level parts · 6 parts in total · full bill of materials below
Ridging Body parts diagram: 1 covering disc, 2 ridge former, 3 ridge press wheel, 4 ball bearing. 6 parts in 4 assemblies.
Ridging Body parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Covering Disc Covering discs
2 Ridge Former Ridge former
3 Ridge Press Wheel Ridge press wheel
4 Ball Bearing Deep-groove radial ball bearing.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Ridging Body

4 top-level lines · 4 rows shown · 6 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Covering Disc potato-planter-cover-disc 2 · part
2 Ridge Former potato-planter-ridge-former 1 · part
3 Ridge Press Wheel potato-planter-press-wheel 1 · part
4 Ball Bearing ball-bearing 2 · part

Where the ridging body is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks