Crop Header
AssemblyFront attachment gathering and cutting the standing crop, either a row-crop maize header or a grass pickup. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Crop Header parts and their functions
4 top-level parts · 17 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Gathering Drums 3 parts | 1× | Gathering drums |
| 2 | Header Knife | 1× | Header cutting disc/knife |
| 3 | Header Auger 2 parts | 1× | Cross feed auger |
| 4 | Header Frame & Drive | 1× | Header structure and drive |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model — STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Crop Header
4 top-level lines · 9 rows shown · 17 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Gathering Drums 3 parts | sp-forage-gathering-drum | 1× | 1 | 12 | assembly |
| 1.1 | Gathering Paddle | sp-forage-gathering-paddle | 6× | 6 | · | part |
| 1.2 | Ball Bearing | ball-bearing | 4× | 4 | · | part |
| 1.3 | Helical Gear Pair | gear-pair | 2× | 2 | · | part |
| 2 | Header Knife | sp-forage-header-knife | 1× | 1 | · | part |
| 3 | Header Auger 2 parts | sp-forage-header-auger | 1× | 1 | 3 | assembly |
| 3.1 | Auger Flighting | sp-forage-auger-flighting | 1× | 1 | · | part |
| 3.2 | Ball Bearing | ball-bearing | 2× | 2 | · | part |
| 4 | Header Frame & Drive | sp-forage-header-frame | 1× | 1 | · | part |
Where the crop header is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
|
🇨🇳Foxconn
foxconn.com ↗
|
Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| flex.com ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| dixoninfo.com ↗ | Noida, IN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| bydelectronic.com ↗ | Shenzhen, CN | Electronics contract mfg | 1,000 pcs | 6–10 wks |
| venture.com.sg ↗ | Singapore | Electronics contract mfg | 1,000 pcs | 6–10 wks |