Straddle Chassis
AssemblyTall inverted-U frame spanning the row, with four driven wheels. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.
Straddle Chassis parts and their functions
6 top-level parts · 65 parts in total · full bill of materials below| # | Part | Qty | What it does |
|---|---|---|---|
| 1 | Portal Frame | 1× | The arch over the vine row that all subsystems hang from. |
| 2 | Wheel Leg 4 parts | 4× | Telescoping leg giving ground clearance and slope leveling. |
| 3 | Wheel Drive Motor 4 parts | 4× | Radial-piston hydraulic wheel motor with integral brake. |
| 4 | Drive Wheel Tire | 4× | Narrow vineyard agricultural tire. |
| 5 | Leveling Cylinder 3 parts | 2× | Cylinder that adjusts leg height to keep the body level on slopes. |
| 6 | Steering Cylinder 3 parts | 2× | Cylinder steering the wheel legs. |
3D model
No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).
Build & assembly graph
expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly
shared across products
atomic part
related product
Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.
Bill of materials for Straddle Chassis
6 top-level lines · 20 rows shown · 65 parts total · indented to 3 levels| # | Item / sub-assembly | Part no. | Qty/assy | Ext. qty | Parts | Type |
|---|---|---|---|---|---|---|
| 1 | Portal Frame | vineyard-harvester-portal-frame | 1× | 1 | · | part |
| 2 | Wheel Leg 4 parts | vineyard-harvester-wheel-leg | 4× | 4 | 6 | assembly |
| 2.1 | Leg Upper Section | vineyard-harvester-leg-upper | 1× | 4 | · | part |
| 2.2 | Leg Lower Section | vineyard-harvester-leg-lower | 1× | 4 | · | part |
| 2.3 | Ball Bearing | ball-bearing | 2× | 8 | · | part |
| 2.4 | Oil Seal | oil-seal | 2× | 8 | · | part |
| 3 | Wheel Drive Motor 4 parts | vineyard-harvester-wheel-motor | 4× | 4 | 6 | assembly |
| 3.1 | Wheel Motor Cartridge | vineyard-harvester-wheel-motor-cartridge | 1× | 4 | · | part |
| 3.2 | Wet Disc Brake | vineyard-harvester-wheel-brake | 1× | 4 | · | part |
| 3.3 | Ball Bearing | ball-bearing | 2× | 8 | · | part |
| 3.4 | Oil Seal | oil-seal | 2× | 8 | · | part |
| 4 | Drive Wheel Tire | vineyard-harvester-wheel-tire | 4× | 4 | · | part |
| 5 | Leveling Cylinder 3 parts | vineyard-harvester-leveling-cylinder | 2× | 2 | 3 | assembly |
| 5.1 | Hydraulic Cylinder Barrel | vineyard-harvester-cylinder-barrel | 1× | 2 | · | part |
| 5.2 | Hydraulic Cylinder Rod | vineyard-harvester-cylinder-rod | 1× | 2 | · | part |
| 5.3 | Cylinder Seal Kit | vineyard-harvester-piston-seal-kit | 1× | 2 | · | part |
| 6 | Steering Cylinder 3 parts | vineyard-harvester-steering-cylinder | 2× | 2 | 3 | assembly |
| 6.1 | Hydraulic Cylinder Barrel | vineyard-harvester-cylinder-barrel | 1× | 2 | · | part |
| 6.2 | Hydraulic Cylinder Rod | vineyard-harvester-cylinder-rod | 1× | 2 | · | part |
| 6.3 | Cylinder Seal Kit | vineyard-harvester-piston-seal-kit | 1× | 2 | · | part |
Something wrong in this list? Report a problem with this BOM.
Where the straddle chassis is used
1 product across 1 domain contain it, directly or inside a sub-assemblyUsed in 1 assembly
Sourcing: possible vendors
Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work| Vendor | HQ | Specialty | MOQ | Lead time |
|---|---|---|---|---|
| bharatforge.com ↗ | Pune, IN | Forgings & metal parts | 500 pcs | 6–10 wks |
| dicastal.com ↗ | Qinhuangdao, CN | Aluminium castings & wheels | 500 pcs | 6–10 wks |
| tataautocomp.com ↗ | Pune, IN | Auto components | 500 pcs | 6–10 wks |
|
🇸🇬Beyonics
beyonics.com ↗
|
Singapore | Precision metal & mfg | 500 pcs | 6–10 wks |
| sundaram-clayton.com ↗ | Chennai, IN | Die castings | 500 pcs | 6–10 wks |