BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Cryogen Delivery System

Assembly

Vacuum-insulated transfer lines routing cryogen from tank to probes with pressure regulation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Cryogen Delivery System parts and their functions

5 top-level parts · 5 parts in total · full bill of materials below
Cryogen Delivery System parts diagram: 1 supply line, 2 return line, 3 main valve, 4 proportional valve, 5 pressure regulator. 5 parts in 5 top-level items.
Cryogen Delivery System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Supply Line 1× Insulated cryogen supply tubing
2 Return Line 1× Exhaust gas return line
3 Main Valve 1× On-off ball valve near tank
4 Proportional Valve 1× Foot pedal-controlled cryogen metering
5 Pressure Regulator 1× Pressure reduction to 1–2 bar delivery

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Cryogen Delivery System

5 top-level lines · 5 rows shown · 5 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Supply Line cryosurgery-unit-supply-line 1× 1 · part
2 Return Line cryosurgery-unit-return-line 1× 1 · part
3 Main Valve cryosurgery-unit-main-valve 1× 1 · part
4 Proportional Valve cryosurgery-unit-proportional-valve 1× 1 · part
5 Pressure Regulator cryosurgery-unit-regulator 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the cryogen delivery system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks