BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Overhead Frame Uprights

Assembly

Welded steel vertical supports, mounted to bed rail clamps, extending 1.5–2 m above mattress. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Overhead Frame Uprights parts and their functions

5 top-level parts · 11 parts in total · full bill of materials below
Overhead Frame Uprights parts diagram: 1 vertical column, 2 horizontal crossbar, 3 diagonal foot brace, 4 base plate, 5 structural welds. 11 parts in 5 top-level items.
Overhead Frame Uprights parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Vertical Column 2× Welded steel tube 40 × 40 × 2 mm, 2 m height, powder-coated.
2 Horizontal Crossbar 2 parts 1× Bridges both uprights, carries pulley mounting bracket.
3 Diagonal Foot Brace 2× 25 × 25 × 2 mm tube, welded gusset, prevents lateral sway.
4 Base Plate 1× Steel plate, welded to uprights and braces, bed-clamp interface.
5 Structural Welds 1× GMAW fillet welds, stress-relieved, stress-tested to 1.5× rated load.

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Overhead Frame Uprights

5 top-level lines · 9 rows shown · 11 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Vertical Column orthopedic-traction-vertical-column 2× 2 · part
2 Horizontal Crossbar 2 parts orthopedic-traction-horizontal-crossbar 1× 1 5 assembly
2.1 Cross Tube orthopedic-traction-crossbar-tube 1× 1 · part
2.2 Pulley Bracket 2 parts orthopedic-traction-pulley-mount-bracket 2× 2 2 assembly
2.2.1 Bracket Plate orthopedic-traction-bracket-plate 1× 2 · part
2.2.2 Fastener Set fastener-set 1× 2 · part
3 Diagonal Foot Brace orthopedic-traction-foot-brace 2× 2 · part
4 Base Plate orthopedic-traction-base-plate 1× 1 · part
5 Structural Welds orthopedic-traction-weld-assembly 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the overhead frame uprights is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$200. How estimates work
VendorHQSpecialtyMOQLead time
🇮🇳Bharat Forge
bharatforge.com ↗
Pune, IN Forgings & metal parts 500 pcs 6–10 wks
dicastal.com ↗ Qinhuangdao, CN Aluminium castings & wheels 500 pcs 6–10 wks
tataautocomp.com ↗ Pune, IN Auto components 500 pcs 6–10 wks
🇸🇬Beyonics
beyonics.com ↗
Singapore Precision metal & mfg 500 pcs 6–10 wks
sundaram-clayton.com ↗ Chennai, IN Die castings 500 pcs 6–10 wks