BOMwiki the bill-of-materials encyclopedia
30,454,201 parts mapped · 193,225 items
Discussion History

Transducer Cooling System

Assembly

Air or liquid circulation managing piezoelectric transducer self-heating during continuous ultrasound operation. A full specification article for this item is being written. Meanwhile its bill of materials and connections are below.

Transducer Cooling System parts and their functions

3 top-level parts · 3 parts in total · full bill of materials below
Transducer Cooling System parts diagram: 1 cooling fan, 2 aluminum heat sink, 3 thermal cutoff. 3 parts in 3 top-level items.
Transducer Cooling System parts diagram. Numbers match the table below; each box is one top-level part or assembly with what it contains.
#PartQtyWhat it does
1 Cooling Fan 1× Small 24V DC fan drawing ambient air through transducer housing
2 Aluminum Heat Sink 1× Aluminum finned radiator in thermal contact with transducer
3 Thermal Cutoff 1× Bimetallic switch or thermal cutoff at 60°C transducer temperature

3D model

No 3D model yet. Have a CAD file of this? Add a 3D model. STL renders right on this page; STEP, FreeCAD, and OpenSCAD sources are welcome too (openly licensed, like all 3D models on BOMwiki).

Build & assembly graph

expand / collapse · shared sub-assemblies converge · links to related products · est. labour
product / assembly shared across products atomic part related product

Tap an assembly to expand/collapse · tap a part to open it · use “Open page” for any node · drag to pan, scroll to zoom.

Bill of materials for Transducer Cooling System

3 top-level lines · 3 rows shown · 3 parts total · indented to 3 levels
# Item / sub-assembly Part no. Qty/assy Ext. qty Parts Type
1 Cooling Fan therapeutic-ultrasound-unit-cooling-fan 1× 1 · part
2 Aluminum Heat Sink therapeutic-ultrasound-unit-heat-sink 1× 1 · part
3 Thermal Cutoff therapeutic-ultrasound-unit-thermostat 1× 1 · part

Something wrong in this list? Report a problem with this BOM.

Where the transducer cooling system is used

1 product across 1 domain contain it, directly or inside a sub-assembly

Used in 1 assembly

Sourcing: possible vendors

Browse the supplier directory → Prices, MOQ, and lead times are algorithmic estimates, not quotes, and not claims about these companies. Company mappings are curated by keyword; est. price band $0.50–$100. How estimates work
VendorHQSpecialtyMOQLead time
🇨🇳Foxconn
foxconn.com ↗
Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
flex.com ↗ Singapore Electronics contract mfg 1,000 pcs 6–10 wks
dixoninfo.com ↗ Noida, IN Electronics contract mfg 1,000 pcs 6–10 wks
bydelectronic.com ↗ Shenzhen, CN Electronics contract mfg 1,000 pcs 6–10 wks
🇸🇬Venture Corp
venture.com.sg ↗
Singapore Electronics contract mfg 1,000 pcs 6–10 wks